title: "Taskwarrior - Taskserver Sync Algorithm"
|
||||
---
|
||||
|
||||
|
||||
# Taskserver Sync Algorithm
|
||||
|
||||
This document describes how task changes are merged by the Taskserver. It does
|
||||
not describe [the protocol](/docs/design/protocol) used by the Taskserver.
|
||||
|
||||
The Taskserver merges tasks from multiple sources, resulting in conflict- free
|
||||
syncing of data. The algorithm used to achieve this is simple and effective,
|
||||
paralleling what SCM systems do to perform a rebase.
|
||||
|
||||
|
||||
## Requirements
|
||||
|
||||
In this document, we adopt the convention discussed in Section 1.3.2 of
|
||||
[RFC1122](https://tools.ietf.org/html/rfc1122#page-16) of using the capitalized
|
||||
words MUST, REQUIRED, SHOULD, RECOMMENDED, MAY, and OPTIONAL to define the
|
||||
significance of each particular requirement specified in this document.
|
||||
|
||||
In brief: \"MUST\" (or \"REQUIRED\") means that the item is an absolute
|
||||
requirement of the specification; \"SHOULD\" (or \"RECOMMENDED\") means there
|
||||
may exist valid reasons for ignoring this item, but the full implications should
|
||||
be understood before doing so; and \"MAY\" (or \"OPTIONAL\") means that this
|
||||
item is optional, and may be omitted without careful consideration.
|
||||
|
||||
|
||||
## Problem Definition
|
||||
|
||||
The sync algorithm considers a single task, with multiple changes occurring in
|
||||
two separate locations that must be resolved. The two locations are the local
|
||||
machine and the server. This results in two parallel change sequences.
|
||||
|
||||
Examples using multiple clients collapse down to the simple two-branch case
|
||||
because the clients are merged serially.
|
||||
|
||||
|
||||
## Change Sequence
|
||||
|
||||
A sequence of changes to the same task is represented as:
|
||||
|
||||
T0 --> T1 --> T2
|
||||
|
||||
Although all examples are of the two-branch variety, some involve trivial
|
||||
branches. Going through these examples will illustrate the algorithm. First the
|
||||
legend:
|
||||
|
||||
T0 Represents the original task, the base.
|
||||
T1 Represents the task with a non-trivial set of changes.
|
||||
T2 Represents the task with further changes.
|
||||
|
||||
|
||||
## Deltas
|
||||
|
||||
The transition from T0 \--\> T1 can be seen as a transform applied to T0,
|
||||
resulting in T1. That transform is the delta (d1) between T0 and T1, which is a
|
||||
subtractive term:
|
||||
|
||||
d1 = (T1 - T0)
|
||||
|
||||
Therefore:
|
||||
|
||||
T0 --> T1 = T0 + d1
|
||||
= T0 + (T1 - T0)
|
||||
|
||||
This states that the transition from T0 to T1 is the application of a delta to
|
||||
the original, T0, which results in T1. Applying this to the whole change
|
||||
sequence yields:
|
||||
|
||||
T0 --> T1 --> T2 = T0 + d1 + d2
|
||||
= T0 + (T1 - T0) + (T2 - T1)
|
||||
|
||||
|
||||
## Use Case Classification
|
||||
|
||||
Because clients sync requests are processed serially, there is no need to
|
||||
consider the multiple client cases. This means there is only ever the case with
|
||||
two parallel change sequences = the two branch case.
|
||||
|
||||
|
||||
## Two Branch Case
|
||||
|
||||
The two branch case represents changes made to the same task in two locations,
|
||||
resulting in two deltas that must be applied to the same base.
|
||||
|
||||
T0 --> T1
|
||||
T0 --> T2
|
||||
|
||||
This reduces to a base with two deltas, but the order in which the deltas are
|
||||
applied is important. For example:
|
||||
|
||||
T0 + d1 + d2 =/= T0 + d2 + d1
|
||||
|
||||
The application of deltas is not commutative, except in the trivial case where
|
||||
the two deltas are identical, or the deltas do not overlap. The deltas therefore
|
||||
need to be applied in the correct sequence. Tasks have metadata that indicates
|
||||
the last modified time, which dictates the sequence. Assuming d1 occurred before
|
||||
d2, this neatly collapses down to a single branch sequence:
|
||||
|
||||
T0 + d1 + d2 = T3
|
||||
|
||||
Note that the result in this case is T3, because it will be neither T1 nor T2,
|
||||
unless the deltas are identical.
|
||||
|
||||
|
||||
## Two Branch, Multiple Changes Case
|
||||
|
||||
The two branch case can be complicated by multiple changes per branch:
|
||||
|
||||
T0 --> T1 --> T3 --> T5
|
||||
T0 --> T2 --> T4
|
||||
|
||||
Note that the numbers were chosen to represent the order in which the changes
|
||||
were made. First a list of deltas is generated:
|
||||
|
||||
T0 --> T1 = d1
|
||||
T1 --> T3 = d3
|
||||
T3 --> T5 = d5
|
||||
T0 --> T2 = d2
|
||||
T0 --> T4 = d4
|
||||
|
||||
d1, d3, d5, d2, d4
|
||||
|
||||
Then the deltas are sorted by modified time:
|
||||
|
||||
d1, d2, d3, d4, d5
|
||||
|
||||
Then epplied to the base, yielding T6:
|
||||
|
||||
T0 + d1 + d2 + d3 + d4 +d5 = T6
|
||||
|
||||
|
||||
## Two Branch Case Example
|
||||
|
||||
Suppose the base task looks like this:
|
||||
|
||||
T0 project:ONE due:tomorrow priority:H +tag1 Original description
|
||||
|
||||
The first branch looks like this:
|
||||
|
||||
T1 project:TWO due:23rd priority:H +tag1 Original description
|
||||
|
||||
The second branch looks like this:
|
||||
|
||||
T2 project:ONE due:tomorrow priority:H +tag1 Modified description
|
||||
|
||||
Delta d1 is:
|
||||
|
||||
T0 project:ONE due:tomorrow priority:H +tag1 Original description
|
||||
T1 project:TWO due:23rd priority:H +tag1 Original description
|
||||
----------------------------------------------------------------------
|
||||
d1 project:TWO due:23rd
|
||||
|
||||
Delta d2 is:
|
||||
|
||||
T0 project:ONE due:tomorrow priority:H +tag1 Original description
|
||||
T2 project:ONE due:tomorrow priority:H +tag1 Modified description
|
||||
----------------------------------------------------------------------
|
||||
d2 Modified description
|
||||
|
||||
If d1 occurred before d2, the result is:
|
||||
|
||||
T3 = T0 + d1 + d2
|
||||
= T0 + (project:TWO due:23rd) + (Modified description)
|
||||
|
||||
T3 = project:TWO due:23rd priority:H +tag1 Modified description
|
||||
|
||||
|
||||
## Use Cases
|
||||
|
||||
A range of illustrated use cases, from the trivial to the complex will show the
|
||||
algorithm in use.
|
||||
|
||||
|
||||
## Use Case 1: New Local Task
|
||||
|
||||
Initial state:
|
||||
|
||||
Server: -
|
||||
Client: T0
|
||||
|
||||
The server has no data, and so T0 is stored. The result is now:
|
||||
|
||||
Server: T0
|
||||
Client: T0
|
||||
|
||||
|
||||
## Use Case 2: Local Change
|
||||
|
||||
Initial state:
|
||||
|
||||
Server: T0
|
||||
Client: T0 --> T1
|
||||
|
||||
The server resolves the change:
|
||||
|
||||
T0 --> T1 = T0 + d1
|
||||
= T1
|
||||
|
||||
T1 is stored. The result is now:
|
||||
|
||||
Server: T0 --> T1
|
||||
Client: T1
|
||||
|
||||
|
||||
## Use Case 3: Local and Remote Change
|
||||
|
||||
Initial state:
|
||||
|
||||
Server: T0 --> T1
|
||||
Client: T0 --> T2
|
||||
|
||||
This is the two branch case, and the deltas are generated:
|
||||
|
||||
T0 --> T1 = T0 + d1
|
||||
T0 --> T2 = T0 + d2
|
||||
|
||||
The order of change is determine to be d1, d2, yielding T3:
|
||||
|
||||
T3 = T0 + d1 + d2
|
||||
|
||||
T3 is stored on the server, and returned to the client. The result is now:
|
||||
|
||||
Server: T0 --> T1 --> T2 --> T3
|
||||
Client: T3
|
||||
|
||||
|
||||
## Use Case 4: Multiple Local and Remote Changes
|
||||
|
||||
Initial state:
|
||||
|
||||
Server: T0 --> T1 --> T3
|
||||
Client: T0 --> T2 --> T4
|
||||
|
||||
This is the two branch case, and the deltas are generated:
|
||||
|
||||
T0 --> T1 = T0 + d1
|
||||
T1 --> T3 = T0 + d3
|
||||
T0 --> T2 = T0 + d2
|
||||
T2 --> T4 = T0 + d4
|
||||
|
||||
d1, d3, d2, d4
|
||||
|
||||
The order of change is determine to be d1, d2, d3, d4, yielding T5:
|
||||
|
||||
T5 = T0 + d1 + d2 + d3 + d4
|
||||
|
||||
T5 is stored on the server, and returned to the client. The result is now:
|
||||
|
||||
Server: T0 --> T1 --> T2 --> T3 --> T4 --> T5
|
||||